The Path to Solar Panels
1. Registration with the Grid Operator
%
-
VDEW Datasheet: Declarations of Conformity for the Inverter,
Non-objection Certificate, Product Data Sheets, Yield Forecast (through Software)The following is required from you:
- Site Plan/Land Register Map 1:500
- Completed Power of Attorney Form
2. Inspection of Commissioning
%
- Examination of the Main
- Connection with Regard to Grid Impact (House Connection Line, Distribution Systems)
- Coordination of the Injection
- Point and Meter Location
- Submission of the Acceptance Contract (Operator Declaration/Commissioning Offer)

3. Financing and Formalities
%
-
Financing Consultation
-
Submission of the financing application
-
Contract signing with B&T Solar UG
-
Early tax registration with the tax office
-
Optional: Taking out PV insurance or reporting to the building insurance
4. Final Preparations by You
%

5. Installation of the System
%
- Construction planning: mechanical, electrical
- Installation of the solar generator (modules)
- Installation of inverters, setup, and connection of data communication
- Meter registration
- Scheduling the connection appointment with the grid operator
6. After Installation
%
- Signing the installation protocol and sending it to B&T Solar UG
- Acceptance of the solar generator
- Final payment to B&T Solar UG

7. Acceptance, connection, and commissioning.
%
Meter installation, grid connection, and technical inspection by the grid operator.
Registration in the Market Master Data Register.
Final inspection with the electrician.
Submission of the signed commissioning protocol.
So kontaktieren Sie uns.
Adresse
B&T Solar Ug
Schmiedestr. 11
25899 Niebüll
Telefon
Festnetz: +49 4662 8969 539
Mobil: +49 172 785 3776
info@btcon.eu

Copyright © 2025 B&T Solar. All Rights Reserved.